end to end can be run via rayagada route but this bbs route i dont think so
Effects Reported so far:
1.Khurda Road-Palasa Over Head Equipment (OHE) is not holding. Attempt to charge the section has failed as reported by TRD/ECoR.
2.The Over Head Equipment (OHE) between Bhadrak-Barang and Talcher-Rajathagarh sections are holding. However, Cuttack-Paradeep & Barang-Khurda Road sections are not holding and...
more... Tower Wagons from Bhadrak & Jajpur-Keonjhar Road have already moved out to the sections.
3.Details of sectional damages can be assessed only after the relief team reports back.
4.As reported by M/s Odisha Power Transmission Corporation Ltd., High Tension (HT) towers have been uprooted at many locations over Khurda Road – Brahmapur section. The details of which are awaited.
5.A large No. of trees are uprooted and falling on track/OHE. Available information is as under::
SECTION
KM
Mandasha - Barua (3 Places)
660/2-4
Golanthara - Barahampur
605/17-18
Sompeta Yard
644/4
Palasa-Sumadevi
669/42-47
Sumadevi-Mandasa
666/6-8 , 665/28-30
Barahmpur-Jagannathpur
596/2-4
Jagannathpur-Chhatrapur
584/30-31
Rambha Yard
554/7-4
Jagannathpur-Barahmpur
596/32-34
Maltipatpur - Sakhigopal
487/4-6
Puri - Maltipatpur
492/3-4
Balugaon-Chilka Section – Mast Damaged at KMs 530/23-25
(J. P. Mishra)
Chief Public Relations Officer