I don't understand why is 20631/32 VB still running with 2 rakes. What was then the point of shifting Primary Maintenance of the train to MAQ.
It being an 8 car-rake, its PM should be covered overnight in 6 hrs and can be accommodated in an RSA with MAQ-MAO VB.