For Kutch
Final Location Survey for New Line Deshalpur-Hajipir via
Nakhatrana New Line (70 kms.)
30CR
40CR...
more...
Final Location Survey for New Line Naliya-Jakhau Port New Line
(27 kms
10CR
23CR
Final Location Survey for Bhuj (Sukhpur)-Mandvi Port (47.42 kms.)
162CR
120 CR
Reconnaissance Engineering cum Traffic Survey for Samakhiali-
Dholavira new line (70 km)
41 lac
Reconnaissance Engineering cum Traffic Survey for new line
between Mandvi and New Bhuj (60 km)
2.5 CR
Final Location Survey for New Line Vayor-Lakhpat via Koteshwar
New Line (84 kms.)
44 CR
70 CR
Survey
please wait...Translate to HindiKutch ke liye
Nayi Line Deshalpur-Hajipir ke liye Final Location Survey via Nakhatrana New Line (70 kms.)
30CR
40CR
Naliya-Jakhau Port New Line ke liye Final Location Survey (27 kms)
10CR
23CR
Bhuj (Sukhpur)-Mandvi Port ke liye Final Location Survey (47.42 kms.)
162CR
120 CR
Samakhiali-Dholavira new line ke liye Reconnaissance Engineering cum Traffic Survey (70 km)
41 lac
Mandvi se New Bhuj ke beach nayi line ke liye Reconnaissance Engineering cum Traffic Survey (60 km)
2.5 CR
Vayor-Lakhpat via Koteshwar New Line ke liye Final Location Survey (84 kms.)
44 CR
70 CR
Survey