Need speed up in HWH-LKO section now. 12327/69: - HWH 13.00; ASN 15.50/16.00; PNBE 21.20/30; DDU 00.50/01.05; BSB 01.40/50; LKO 06.25/35; BE 10.20/25; MB 12.00/10; HW 15.20/30; DDN 17.00|| 12328/70: - DDN 22.50; HW 00.10/20; MB 03.05/10; BE 04.40/45; LKO 08.40/50; BSB 13.35/45; DDU 14.20/35; PNBE 17.55/18.05; ASN 00.05/15; HWH 03.20|| Up direction 1591 kms in 28 hrs @ 57 kph\ Dn direction 1591 kms in 28 hrs 30 mins @ 56 kph. For this, 12402 New timings must be DDN 23.00; NZM 04.45/05.05; KOTA 10.45||