Will Run with LHB coaches from 30.10.2021 with revised coach composition. CC-LWLRRM -2, LS 5/LWS-2,LWSCN-6,LWACCN-5,LWACCW-2,LWCBAC-1,LVPH-2 Total= 20 coaches
Train will be diverted between ET & GTL from 1st Nov to 13 th Nov due to NI & track maintenance work near SC section.
Past EditsNews Entry# 0
Will Run with LHB coaches from 30.10.2021 with revised coach composition. CC-LWLRRM -2, LS 5/LWS-2,LWSCN-6,LWACCN-5,LWACCW-2,LWCBAC-1,LVPH-2 Total= 20 coaches
Train will be diverted between ET & GTL from 1st Nov to 13 th Nov due to track maintenance work near SC section.
News Entry# 0
Will Run with LHB coaches from 30.10.2021 with revised coach composition. CC-LWLRRM -2, LS 5/LWS-2,LWSCN-6,LWACCN-5,LWACCW-2,LWCBAC-1,LVPH-2 Total= 20 coaches