For train no 12219/12220 LTT SC Duronto Express we have rake idle time of 3 days plus.
Plus patronage is not upto the mark as is required.
So was wondering to optimise rake availability, why can't IR consider extension of this Duronto till Chennai via Nalgonda - Guntur - Ongole.
...
more... This will give a new connection to Mumbai and many unconnected cities will find a fastest connection to Mumbai.
Besides patronage can be guaranteed...
Have enclosed a Tentative TT in here...
/train/121307/35/466/train/121301/466/35 Need your comments.
please wait...Translate to EnglishYo, for the train number 12219/12220 LTT SC Duronto Express, we got a long-ass idle time of 3 days and then some. Plus, the number of passengers ain't up to snuff. So I was thinking, to make better use of the train, why doesn't the Indian Railways extend this Duronto all the way to Chennai via Nalgonda - Guntur - Ongole? That way, we'll have a fresh connection to Mumbai and folks from other cities can finally catch a fast train to Mumbai. Plus, we can guarantee that the number of passengers will increase. Check out this tentative train schedule here: [link]. Let me know what you think.
please wait...Translate to HindiTrain no 12219/12220 LTT SC Duronto Express ke liye humare paas 3 din ya usse zyada ka idle time hai.
Aur iske patronage ki kami hai jo required hai.
Toh soch rahe hain ki rake availability ko optimize karne ke liye, IR kyun na is Duronto ko Chennai tak extend kare via Nalgonda - Guntur - Ongole.
Isse Mumbai ke liye ek naya connection milega aur kayi unconnected cities ko Mumbai tak sabse fast connection milega.
Saath hi patronage bhi guaranteed ho sakta hai...
Tentative TT ko yahaan attached kiya gaya hai...
/train/121307/35/466/train/121301/466/35 Aapke comments chahiye.