cabins mostly control the junction points/switches that control the incoming/outgoing line on station.
the abandonment of cabins is probably due to newer, more sophisticated method of controlling junction points like RRI or ESI, which drastically reduce the connections required to control the points, so when NI works are taken up they probably get abandoned in favor of more centralized, SCADA based control.