This can also be mitigated by using battery (installed in locos) based supplies whenever a trn is crossing neutral section or any interchange point. Bt as battery can't take dat much load as much a grid can take so provision for reduction in load during supply changeover frm OHE to battery should be made. N again when OHE is available, load would be fully transferred to OHE frm battery.