The timings are not at all feasible..85 mins stoppage at Nuapada and 65 mins at BBSR is delaying the total journey hours.Either change the timings to maintain the rake at Rourkela or make arrangements at Gunpur. Also add few sleeper coach along with a 3 or 2 ac coach with pantry facility.