Dated 02/08/2015 - 12501 was due late by 0230hrs after departing from ALD and was heading towards CNB for next schedule halt. On the way to CNB when 12501 crossed SYWN, SM of SYWN SM saw unusual condition of AC coach NF 98051 of 12501 , Cover of AC was suspended due to loosen of Nuts and Bolts. As soon this was spotted by SM he informed to BRE SM , Understanding the situation SM of BRE allowed 12501 to loop line and carried out the possible rectification of the problem and showed alertness towards the service. A major accident was averted.
Thanking you SM BRE/SYWN.