Nowadays, railways work on the minimum layover period of the train at its destination. Your suggestion is good, but then PPTA SF will have to do RSA with some short-distance trains. RSA with 15079/80 GP-PPTA-GKP can be a good option.
please wait...Translate to EnglishToday, railways operate on the minimum layover time for trains at their destinations. Your suggestion is good, but PPTA SF would then need to operate a return service (RSA) with some short-distance trains. An RSA with 15079/80 GP-PPTA-GKP could be a good option.