Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sat Oct 12 17:16:59 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 537608
Jan 15 (17:02) Safety Inspection of Newly Doubled Rail Line and Third Line in Chhapra-Ballia Doubling Project
11469 views
0

Entry# 5942971   
  Past Edits
Jan 15 2024 (17:03)
Station Tag: Ballia/BUI added by scsharma1986/746156

Jan 15 2024 (17:03)
Station Tag: Chhapra Junction/CPR added by scsharma1986/746156
Stations:  Chhapra Junction/CPR   Ballia/BUI  
छपरा-बलिया दोहरीकरण परियोजना का रेल संरक्षा आयुक्त ने किया निरिक्षण

On Sunday, the Commissioner of Railway Safety (CRS), North Eastern Circle, Pranajeev Saxena, inspected the newly doubled rail line and the third line constructed between Chhapra-Gautamsthan stations and Chhapra Kacheri-Chhapra stations, respectively, as part of the Chhapra-Ballia doubling project. The inspection was conducted after the completion of the doubling and third...
more...
line construction along with electrification. The CRS inspected various aspects, including the station yard, station panel, circulating area, yard remodeling, new relay room, integrated power supply system, upgraded route relay interlocking, platform clearance, overhead line clearance, entry and exit clearance, new equipment installed, and changes in station working rules at Chhapra Junction. He then inspected the new line from Chhapra Kacheri using a push trolley, checking safety standards, including bridges, curves, level crossings, and the knowledge of gatemen. The inspection also included measuring the indent between curves 1A and 1B, inspecting the limited height subway (LHS) and major bridge 1. The CRS then used a motor trolley to inspect curves 1C and 1B. He also inspected bridge 2, LHS 2A, curvature 1E and 1F, major bridge 3, curve 1H, bridge 4, LHS 4A, bridge 5, and level crossing 57C before reaching Gautamsthan. At Gautamsthan station, the CRS inspected the doubling work according to safety standards, including rail track gauge, line fittings, signal installations, ballast cushioning, ballast spreading, track liners, standard distance between the electric traction line and poles, standard position of overhead line supports and poles, and safety standards for bridges and culverts along the rail line.

Sunday ko, Commissioner of Railway Safety (CRS), North Eastern Circle, Pranajeev Saxena ne Chhapra-Ballia doubling project ke under Chhapra-Gautamsthan stations aur Chhapra Kacheri-Chhapra stations ke beech banaye gaye new doubled rail line aur third line ka inspection kiya. Ye inspection doubling aur third line ke construction ke completion ke baad electrification...
more...
ke saath kiya gaya. CRS ne station yard, station panel, circulating area, yard remodeling, new relay room, integrated power supply system, upgraded route relay interlocking, platform clearance, overhead line clearance, entry and exit clearance, new equipment installed, aur station working rules mein change, sabhi ka inspection Chhapra Junction pe kiya. Fir unhone push trolley se Chhapra Kacheri se new line ka inspection shuru kiya. Trolley inspection ke dauran unhone bridge 57, curve C, level crossing 46spl, 51C aur 53C ka safety inspection kiya, aur thihri line ke khand ke standard ke anusar mapan kiya. Saath hi gateman ke safety knowledge ko bhi jaancha. Iske baad unhone curve 1A aur 1B ke indent ka mapan kiya aur saath hi limited height subway (LHS) 1A aur major bridge 1 ka inspection kiya. Fir CRS motor trolley se curve 1C aur 1B ka major maintenance kiya. Issi sequence mein, unhone bridge 2, limited height subway LHS 2A, curvature 1E aur 1F, major bridge 3, curve 1H, bridge 4, LHS 4A, bridge 5, aur level crossing 57C ka inspection karte hue Gautamsthan pahunche. Gautamsthan railway station pe, CRS ne doubling ke standard ke anusar safety inspection kiya. Is inspection mein, CRS ne rail path ki jadai, line fittings, signal ka installation, ballast ki cushioning, ballast failaai, rail path ke liner, rail path se vidyut traction line aur polon ki standard doori, overhead line ke support aur polon ki standard sthiti aur rail khand mein padne wale pul, puliyaon par safety ke sabhi manadand ko parakha.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy