#NFR_Electrification02 nos of Tower wagons has been successfully commissioned in Tinsukia division today. A trial run from New Tinsukia to New Sisiborgaon was successfully performed. DRM/TSK along with ADRM/TSK and BOs flagged off the trial run at New Tinsukia. @RailNf
Picture Date 28 August 2022