Shri Sanjeev Kishore, General Manager, South Western Railway, conducted statutory annual inspection on Ballari-Gadag Section over Hubballi Division 14.03.2022.
A speed trial was conducted between Ballari and Daroji station clocking a speed of 110 kmph. This is a testimony to the good maintenance of track, signaling and other parameters.