The route length is too long for a normal passenger train to run. Plus the single track from BUW STP slows it furthur. I am looking forward to GKP Bahraich Passenger. The main route had it's gauge conversion four decades ago and hence, GKP and Bahraich have lacked direct connectivity since then. Plus the route length there is shorter as well.