line is a siding going towards JSW steel plant
⏺️2nd line goes towards Ranajitpura
2) Railway line visible from Ballari - Toranagallu - Sandur - Kudligi road before Vaddu level crossing is siding towards JSW steel plant and OHE poles were not there adjacent this line
⚫Toranagallu - Ranajitpura line becomes visible from Ballari - Toranagallu - Sandur - Kudligi road after Vaddu level crossing
⚫Aligned OHE poles were observed adjacent Toranagallu - Ranajitpura line in between Vaddu level crossing and Vidyanagar township
3) & 4) Land leveling done between Vaddu level crossing and LC No.5 is for road not for doubling of Toranagallu - Ranajitpura line (confirmed by railway staff)
5) to 15) Aligned OHE poles were observed adjacent Toranagallu - Ranajitpura line (2nd line) in between Vidyanagar township and LC No.5 i.e., from 5.6 km to 6.5 km
⏺️1st line seen in these photos is a siding from Bannihatti to JSW steel plant (confirmed by railway staff) and OHE foundations/poles were not there adjacent this line
16) Location of LC No.5
Pictures source: Self
Screenshots source: Google maps