Rail fanning at #BallariJnouter (towards Guntakal side) on #November15th2018
ЁЯФ╕ #Electrificationupdate of RUB 266A (locally known as Durgamma temple bridge) and ROB 267B (locally known as Satya Narayana Pet bridge) section from 208.9 km to 209.8 km (towards Guntakal side)
1) RUB 266A
2) 1st line towards left is up line. 2nd line towards right is down line
тП║я╕ПAdjacent...
more... up line
3) Pit for OHE pole / relay cabinet
4) Foundation for OHE pole
5) Foundation for relay cabinet
6) to 8) Foundations for OHE pole
тП║я╕ПAdjacent down line
9) Foundation for relay cabinet
10) to 12) Foundations for OHE pole
13) Foundations for relay cabinet
тП║я╕ПOHE poles adjacent both up & down lines
14) to 16) OHE poles (not aligned) were spotted after 209.0 km
17) Aligning of OHE poles under progress at 209.7 km
18) & 19) Aligned OHE poles were spotted after 209.7 km
ЁЯФ╕Update regarding ROB 267B (locally known as Satya Narayana Pet bridge) -
#SNPetROBтП║я╕ПTowards Gandhi Nagar / Nehru Colony
20) to 22) Construction of pillars completed. Girders placed on pillars for entire stretch
тП║я╕ПTowards Satya Narayana Pet (S N Pet)
23) to 26) Construction of pillars completed. Girders placed on pillars for entire stretch
27) & 28) Road construction under progress
Pictures source: Self